img

Bihar is experiencing an unprecedented development in its road transport infrastructure. The starting point of this journey is the state’s first Green Field Expressway, which is expected to transform the development, transport, trade and industry activities for the people of this region. The Patna-Purnia Four-Lane Green Field Expressway is the name of this particular project which has already been approved and is expected to change the face of transport in Bihar.

Massive Boost for Bihar's Road Network

Bihar was one of the states that lagged in infrastructure development when compared to other states in the country. But things have started to change recently. The announcement and the order for this new expressway project is evidence of that change. This expressway will now allow the travel between the capital city Patna and Purnia to be covered in 3 hours as compared to the previous 5 hours. The total distance of this expressway will be 281.95 km, therefore making it the longest expressway in Bihar.

Land Acquisition and Compensation: A Big Win for Farmers

This expressway isn’t just about roads—it’s about changing the standard of living for the people. The project is expected to acquire 3381.2 acres (approximately 2600 acres) of land from 29 blocks across six districts that includes over 250 villages. This budget is expected to be around ₹9,467.40 crore, of which most will be compensated to the farmers and landowners.

The sanguine prognosis regarding the massive capital infusion into rural economies suggests that the standard of living for small and marginal farmers could greatly improve, the funds are purported to yield new opportunities, upgraded facilities, and elevated living conditions for thousands of families.  

Expletive road --> lifeline for the most vulnerable regions  

Apart from improving the region's connectivity, the expressway is expected to benefit the infrastructure of fifteen flood prone blocks including, but not limited to, parts of earthquake affected districts like Dharbanga, Saharsa, Samastipur and Madhepura. Agricultural Development Marketing places had previously faced waterlogging and poor transport access during the flood season leading to inadequate transport accessibility.  

With the construction of the expressway, works like building bridges over major rivers like the Gandak, Budhi Gandak, Bagmati, Kamla and Kosi among others, will also be undertaken. The construction of these works ensures unfettered road access throughout the year and efficient control of water and flood management in the area. Maximally simplier sentences possible.

An Amazing Development in Technology: The Efficient Use of Space and Planning

The expressway is considered an infrastructure giant – it’s no ordinary project:

Total Length: 281.95 km
Max Speed Limit: 120 km/h
Cost: ₹18,042.14 crore
Major Bridges: 21
Minor Bridges: 140
Interchange Bridges: 21
Railway Overbridges: 11
Underpasses: 322

The expressway is constructed with six lanes for smooth and uninterrupted traffic flow. It is smoothly linked with 11 National Highways (NH) and 10 State Highways (SH) which significantly improves both inter- and intra-state connectivity within Bihar.

Route Map: Connecting the Heart of Bihar

The expressway will originate from Mirnagar in Vaishali district, and will also pass through:

Purnia

Dashrath Lakhisarai

Samastipur

Darbhanga

Saharsa

Madhepura

Besides, dedicated link roads will be constructed ensuring last mile connectivity directly with the expressway from Samastipur, Saharsa, and Madhepura.

Sustainable Development with Green Margins

Incorporating eco-friendly and balance with the ecosystem further enhances the Patna-Purnia expressway.

Green margins along the expressway

Construction with sustainable materials

Landscaping that reduces noise levels

Efficient noise barrier drains

These efforts will ensure that the Patna–Purnia Expressway will not just a road, but a model of modern approach to construction.

The expressway does much more than just provide a path, it serves as an artery centered around the core of movement that supports new opportunities in the economy.:

Achieved Growth: Improvements in vehicle and cargo movement speeds.

Stronger development of agriculture: New market avenues for previously isolated farmers.

Strengthening of the tourism sector: Enabled travel to valuable heritage and religious landmarks.

Job creation: Employment of thousands during construction and in the long term.

Increased Investment: Most likely to induce industry, logistics centers, and further facilities along its route.

 


Read More: Delhi Judge Abused and Threatened in Court During Cheque Bounce Case Hearing