RSPCB Sets 15-Day Integration Deadline in Bhiwadi Review

Post

In a comprehensive regulatory push to curb air pollution and enforce real-time continuous emission monitoring across Rajasthan’s industrial belts, Rajasthan State Pollution Control Board (RSPCB) Chairperson Aparna Arora convened a high-level virtual review meeting on Saturday, October 3, 2026. Directly addressing industrial delegates and regional environmental officers from critical manufacturing corridors—including Bhiwadi, Alwar, and Bharatpur—the state pollution control chief issued a binding regulatory mandate requiring all manufacturing and processing units to maintain a minimum 85 percent real-time data transmission rate to the centralized Central Pollution Control Board (CPCB) portal. The emergency interaction addressed operational bottlenecks, including systemic portal linkage failures, expedited deployment of Air Pollution Control Devices (APCD), and fugitive road dust mitigation across the National Capital Region (NCR) periphery.

Strict 85% Real-Time Data Threshold: Bridging Linkage Gaps Between State and Central Servers

The core agenda of the state-level review focused on synchronizing continuous emission monitoring systems (CEMS) with central surveillance infrastructure:

Non-Negotiable 85% Compliance: Chairperson Aparna Arora underscored that local transmission to the state dashboard alone is insufficient, making it mandatory for every operational unit to transmit at least 85 percent of its telemetry and stack emission data directly to CPCB servers.

Resolving Server Disconnects: During the session, industrial representatives pointed out that while units were actively uploading live parameters onto the RSPCB portal, several industrial enterprises were encountering digital handshake errors and failing to receive active API links from the central CPCB portal.

Rapid Administrative Resolution: Addressing these operational hurdles, Bhiwadi Regional Officer (RO) Amit Juyal assured factory owners that department technical specialists would step in immediately to resolve individual server connectivity issues within a strict three-to-four-day window.

Bhiwadi Onboarding Trajectory: 54 Units Connected, Balance to Integrate Within 15 Days

Regional enforcement teams presented progress metrics on expanding industrial connectivity across Bhiwadi’s extensive manufacturing zones:

54 Industrial Units Linked: As of October 2, 2026, a total of 54 major industrial units in Bhiwadi have achieved complete live data integration with the national CPCB server.

15-Day Completion Horizon: Regional Officer Amit Juyal announced that the technical onboarding process for all remaining industrial operations will be executed on a war footing, targeting 100 percent integration within the next 15 days.

Mandatory Action Notice: Industrial plant managers and factory heads were urged to complete internal telemetry configurations without delay to avert punitive regulatory notices or statutory operating bans.

Industrial Leadership Deliberations: APCD Installations, Dust Suppression, and BMA Representation

The digital conference witnessed active participation from apex industrial leadership to balance compliance demands with technical support:

Focus on APCD Gadgets and Dust Abatement: Beyond digital compliance, the review examined on-site air management, directing factories to ensure optimal functioning of installed Air Pollution Control Devices (APCD) and execute mandatory water-sprinkling protocols to curb fugitive road dust generated by heavy transit.

Prominent Industry Representation: Key leadership from the Bhiwadi Manufacturers Association (BMA) participated in the deliberations, led by BMA President Chaudhary Jasbir Singh Rana, former President Surendra Singh Chauhan, Honorary Secretary GL Swami, Yogesh Jain, Treasurer Naresh Kumar Goyal, and Vice President Randhir Singh.

Collaborative Pollution Mitigation: Association leaders pledged full technical cooperation with state authorities to establish Bhiwadi as an environmentally compliant manufacturing corridor while seeking prompt resolution of administrative portal glitches.