Atal Bridge Controversy: Cracks everywhere in Vadodara’s Atal Bridge Controversy – Poor work, questions raised on contractor

[ad_1]

Atal Bridge Dispute: Vadodara city’s longest Atal Bridge has come under controversy once again, the condition of this bridge built at a cost of 228 crores has now deteriorated, many questions have been raised on the performance of the contractor.

This is the longest atal bridge built in Vadodara city, this atal bridge is 3 kilometers long from Geda circle to Manisha char road. At present, the work of breaking and repairing the block of the support wall of the bridge is being done starting from Geda Circle. The gap between the bridge and the supporting wall has continued to cause large cracks in the walls, raising questions against the contractor’s performance and further fueling the dispute. At present, work has been started here on the bridge by breaking the block and keeping a gap between the support wall and the bridge.

Currently, this repairing work is going on from Geda Circle towards the bridge. Interestingly, this Atal Bridge has been built at a cost of 228 crores and was inaugurated on December 25. However, now she is constantly surrounded by controversies. Many questions are being raised on the performance of the contractor of this bridge.